Projects

Below is a sample of Gateway Pacific Contractors, Inc's current and past projects.

Bay St. Reservoir Replacement-Ph. 3

Bay St. Reservoir Replacement-Ph. 3

Design-Build project to replace four bolted steel storage tanks with one 6MG prestressed concrete water storage tank, associated piping and significant foundation mitigation inside and existing concrete basin.

Micromidas Pilot Plant

Micromidas Pilot Plant

This $3.5M pilot plant located in W. Sacramento, CA transforms corrugated cardboard into paraxylene, a chemical used to make plastic bottles.

Chico Digester Cover Replacement

Chico Digester Cover Replacement

We replaced a floating digester cover, digester gas piping and waste gas flare for City of Chico WPCP.

Banner Taylor

Banner Taylor

Nevada Irrigation District, Grass Valley, CA Replace a hypalon lined and covered earthen reservoir with two prestressed concrete potable water storage tanks (10.5MG)

Recycled Water System Expansion

Recycled Water System Expansion

City of San Clemente, CA Modification and construction of various treatment facilities including tertiary filters, chlorine contact basins, chemical building/storage, effluent pump station, electrical/controls/SCADA and related support facilities.

Bay St. Reservoir Replacement-Ph 2

Bay St. Reservoir Replacement-Ph 2

City of Santa Cruz, CA A 6MG prestressed concrete potable water storage tank, associated pump station, supply piping and significant foundation mitigation constructed inside an existing concrete-lined reservoir basin.

Napa Recycled Water Expansion

Napa Recycled Water Expansion

Napa Sanitation District, Napa, CA Modification of existing and construction of new facilities, including DAF, chlorine contact basin, equalization basins, filters, pump station and chemical facilities.

EAGLE PASS BRIDGE REPAIR

EAGLE PASS BRIDGE REPAIR

Precast concrete bridge for Border Patrol use.

PRIMARY AREA IMPROVEMENTS PROJECT

PRIMARY AREA IMPROVEMENTS PROJECT

Replacement of influent screening equipment and screening handling equipment for Encina Wastewater Authority.

RESERVOIR 4605-1 CONSTRUCTION (SKY MOUNTAIN PRESSURE ZONE)

RESERVOIR 4605-1 CONSTRUCTION (SKY MOUNTAIN PRESSURE ZONE)

Construct 10MG prestressed concrete potable water storage reservoir.

GRAY LODGE WILDLIFE AREA WATER SUPPLY

GRAY LODGE WILDLIFE AREA WATER SUPPLY

Widen 5 miles of existing canal including numerous check structures and road crossings to increase water supply for Gray Lodge Wildlife Area.